Xiaojia Loading Station

Introduction:

Shenhua Zhunneng Xiaojia Shayan Coal Storage and Delivery Limited (神华准能肖家沙墕煤炭集运有限责任公司) was established in September 2011 as a joint venture mainly engaged in coal loading, unloading and transportation with an independent status of legal person, in which Zhunneng holds 55% equity and Kinetic Coal holds 45% equity.

Xiaojia Railway Centralised Coal Transport Station adopts the cutting-edge fast and quantity-controlled loading technology with current loading capacity of 10.0 million tonnes, forward loading capacity of 15.0 million tonnes per year, average loading time of 55 seconds per carriage (80 tonnes) and 2.5 hours per train (105 carriages). The loading and transportation volume of Xiaojia Centralised Transport Station was 5.4 million tonnes in 2018.

Advantages:

A. Advantageous and convenient geographic location: Xiaojia Centralised Transport Station is located 1,200 meters to the north of the industrial square of the Dafanpu Coal Mine, and is connected to the southern branch line of Dazhun Line;

B. Accurate and efficient loading system: Xiaojia Centralised Transport Station is an automated quantity-controlled loading station with a design capacity of 5,000 tonnes/hour, which can ensure accurate loading, effectively prevent and control under-loading and over-loading incidents, and fully satisfy the loading needs of self-produced and purchased coal.